-- card: 19209 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 3633 -- name: Change to Milestone -- part 25 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=56 right=71 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 26 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=241 top=56 right=71 bottom=463 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part contents for card part 25 ----- text ----- Change to Milestone -- part contents for card part 26 ----- text ----- Change to Task -- part contents for background part 6 ----- text ----- Changes the selected task or supertask into a milestone. You can also create a milestone box by holding down the Command key while you draw the box in the Schedule Chart. -- part contents for background part 7 ----- text ----- Changes the selected milestone or supertask into a task. When you change a supertask into a task, the information previously included from the subproject is replaced by the default task information, including a Task Duration of zero. -- part contents for background part 28 ----- text ----- Change to Milestone or Task -- part contents for background part 27 ----- text ----- The Task Menu